项目内容及规模:建设日产5万吨规模的市第二自来水厂 、投资总额:5000万元(不含城市供水管道)

放大字体  缩小字体 发布日期:2014-01-09  浏览次数:301
核心提示: 一、项目内容及规模:建设日产5万吨规模的市第二自来水厂 二、项目
中国给水排水 云直播

中国给水排水2021年中国城镇污泥处理处置 技术与应用高级研讨会(第十二届)邀请函暨征稿启事
 

一、项目内容及规模:建设日产5万吨规模的市第二自来水厂

二、项目建设条件及前期工作情况:市自来水公司198710月正式向城区供水,经二期扩建后设计供水能力为5万吨/日,但实际日供水能力4万吨/日不到。按照城市用水量综合计算,耒阳市城区36万人口再加上部分工商业用水,自来水生产规模至少应达到15万吨/日才能满足需要。此外,东江地区为耒阳市工业区,该区隔耒河与市区对峙,随着城市建设的飞速发展,该区大型企业及合资、私营个体企业迅速增加,人口增长也很快,但用水却极为困难,严重制约着生产与经济的发展。该区有丰富的水资源,耒水河环绕该区而过,水质优良、水量充沛。目前,该项目已完成初步规划设计、选址、可行性研究报告的编制,并经衡阳市计委以衡计投(200301号文件批准立项。

三、投资总额:5000万元(不含城市供水管道)。其中固定资产投资4500万元,流动资金

500万元。

四、拟合作方式:合资、合作、独资均可

五、拟合作期限:15

六、经济效益:预计年产值可达2000万元,可上缴税金120万元,投资可在10年内全部收回。

七、项目单位:耒阳市自来水公司

八、项目联系人及电话:

    孙平修07344312088   013873420058

 

 

Constructing the Second Water Factory in Leiyang (Dongjiang Water Factory)

 

1Project Content and Scale: Constructing the Second Water Factory in Leiyang for daily production of 50,000 tons;

2Project Construction Condition and Earlier Period Work: The city water company started to supply water in October 1987. It designed to supply 50,000 tons per day by the second expansion, but actually is 40,000 tons. Integrated urban water consumption in accordance with the terms of 300,000 population and water using in commercial and industry, the water output should at least reach 150,000 tons per day to meet the need. In addition, Dongjiang, Separating from the urban by Leishui River, is the industrial zone of Leiyang. With the rapid development of urban construction, large enterprises and joint ventures, private enterprises as well as the population of this area increased rapidly , but the water is extremely shorten that seriously constraints in production and economic development. The area is rich in water resources. Lei River, with high quality and proficient water surround it. Until now, it has completed the preliminary design, site selection and feasibility study report. Hengyang Planning Commission has approved and initiated the project according to NO.1 (2003) document.

3Total Investment: RMB 50 million Yuan;

4Proposed Way of Cooperation: Joint venture, contractual joint venture or exclusive venture;

5Cooperation Period: 15 years;

6Economic Efficiency: Estimating that annual output value of 20 million yuan, 11 million yuan in profits and taxes, and investment payback period for 10 years;

7Project Unit: Leiyang City Running Water Company;

8Project Contact: Xiu Pingsun;

Tel: 0734-43120880